Nadzab (Lae)

Existing drawing
아직 등록된 도면이 없습니다
Existing Layout

Existing Facilities

번호(①②③)를 누르면 도면에서 그 시설의 위치를 짚어줍니다
Adequate — meets requirements for the current fleetDeficiency — upgrade or remediation requiredTo Confirm — data outstanding for the 90% report

Airside Facilities

Ch. II §1 · 3 items

Runway

  • e.g
  • 2,750 m × 45 m (12R/32L)

Taxiway

  • e.g
  • Parallel taxiway A, 23 m wide

Apron

  • e.g
  • Passenger apron — 4 × Code C stands

Passenger Terminals

Ch. II §2 · 1 item

Terminal

  • e.g
  • Domestic terminal, 3,200 m²

Section 1

Aviation Demand Forecast

Annual Passengers

Forecast data will be added here.

Flight Movements

Forecast data will be added here.

Peak Hour Movements

Forecast data will be added here.

Section 2

Facility Plan

Master-plan facility checklist (SOW Element 4). For each facility, mark whether it is Complete, Missing, or Needs Improvement.

✓ Complete 0✕ Missing 0△ Improve 0• Not assessed 9
Runway
Length, width & pavement strength for the critical aircraft (RDC).
Runway Strip / RESA
Graded strip and runway end safety areas to ICAA standards.
Crosswind Coverage
Wind analysis — need for a crosswind runway from historical wind data.
Taxiway System
Parallel / connector taxiways and separation criteria.
Commercial Apron
Air carrier aircraft parking apron & gate stands.
GA Apron
General aviation aircraft parking apron.
Airfield Lighting
Runway / taxiway lighting, signs and markings.
Navigation Aids (NAVAIDs)
Electronic, visual and satellite navigation aids.
Airspace / OLS
Obstacle limitation surfaces & Part 77 airspace protection.

Section 3

Economic Evaluation

Total Project CostTBD
B/C RatioTBD
NPVTBD
EIRRTBD
Notes / Methodology
Economic evaluation methodology and assumptions to be documented here.
Next

Continue building the master plan for Nadzab (Lae).