Task 3 · Desktop Studies

Ten provincial
airports.
One programme.

Prepared without a site survey. Every quantity here is drawn from records — the project demand forecast, the National Airports Corporation movement record, published schedules and the planning standards — not from inspection.

1,452,616passengers a year by 2045
$130mcapital cost, 2026 prices
$170mas actually spent
01 · The ten

All ten, side by side

Sorted by 2045 passengers, largest first. Click any column heading to re-sort, or any row to open that airport's study summary.

Airport2011 – 2045
9
Buka Airport
BUA · Autonomous Region of Bougainville
73,091
×1.73
2.9%/yr
490 m²
+198
2
from 2
$10.33m
$14.51

Passengers grow ×1.73 to 73,091 a year by 2045. That needs 198 m² more terminal and no additional aircraft stands — $10.33m in 2026 prices, $12.82m as actually spent.

Passengers rise faster than flights because the average aircraft grows from 45 to 55 seats. The 2045 peak hour is 27 passengers — that single moment, not the annual total, is what the terminal is sized for.

The airport in 2026 and in 2045

20262045Change
Passengers per annum42,30373,091×1.73
Aircraft movements2,0892,953×1.41
Seats per movement4555+10
Peak hour movements0.81.1
Peak hour passengers1627
Passenger terminal (m²)292490+198
Aircraft parking apron (m²)3,3083,308+0
Aircraft stands22

2045 stands are 1 Code C commercial position and 1 for general aviation and light aircraft.

Capital cost

Passenger terminal — new and extended floor area198 m²$0.60m
Passenger terminal — refurbishment of the retained floor area292 m²$0.26m
Aircraft parking apron — pavement0 m²$0.00m
Taxiway and taxilane pavement0 m²$0.00m
Landside forecourt, access roadway and car parking270 m²$0.07m
Airfield ground lighting and navigational aids1 item$3.00m
Airside ancillary — rescue and fire fighting, fuel, service roads, fencing1 item$3.50m
Direct works$7.43m
Utilities, design and contingency$2.90m
Total, 2026 prices$10.33m

Spend by phase

RealAs spent
Short term 2026–2030$7.04m$7.71m
Medium term 2031–2037$2.74m$3.95m
Long term 2038–2045$0.56m$1.16m
Total$10.33m$12.82m

The $2.50m difference is price escalation, not extra work. Recovering the investment needs $14.51 per passenger in 2045 — $0.75m a year of capital charge plus $0.31m of operating and maintenance, spread over 73,091 passengers.

Runway 04/22, 1,562 m × 30 m, asphalt
Elevation 3.4 m  ·  Code 3ⅡC  ·  Design aircraft Fokker 100  ·  Lit
Routes 2025 POM 365 · RAB 205 · KIE 52  — Port Moresby is 365 of the 622 departures.
Committed works Under CADIP tranche 3 the pavement is strengthened, the runway is extended and a new terminal building is provided. Fencing was awarded under tranche 2 in October 2016.
Full study: PNG AMPC Desktop Study-BUA.docx
02 · Geography

A programme spread across a country

The ten sit in ten different provinces, from Vanimo on the north-west border to Alotau at the eastern tip. Shaded circles mark the ten and their size is the 2045 forecast; Port Moresby and the three Task 2 hubs are on the base map for context.

The ten Task 3 airports
03 · Today

What flies there now

Before any forecast: 10,417 scheduled departures across the ten in 2025. How much of that is Code C — the commercial turboprops and small jets that size a stand — varies enormously, from 17% at UNG to 96% at MAS.

Share of movements that are Code C

MAS
96%
71.2t mean
HKN
95%
19.7t mean
KVG
88%
35.5t mean
BUA
84%
27.9t mean
GUR
72%
33t mean
VAI
71%
26.1t mean
WWK
65%
20.9t mean
MAG
58%
16t mean
GKA
43%
10.7t mean
UNG
17%
6.5t mean

The remainder is general aviation, light aircraft and helicopters — which need parking, but not a gate. Kiunga Airport is the outlier: almost all of its recorded traffic is light aircraft.

Largest operators, all ten

GKAMAF (PNG) LIMITED 2,521Air Niugini 2,198
WWKAir Niugini 2,496PNG Air 1,388
HKNPNG Air 2,416Air Niugini 1,855
MAGAir Niugini 1,991PNG Air 1,285
KVGAir Niugini 1,780PNG Air 1,292
GURAir Niugini 1,182PNG Air 412
VAIAir Niugini 1,049PNG Air 381
MASAir Niugini 1,003Tropicair Limited 18
BUAAir Niugini 982PNG Air 574
UNGKobio Aviation Ltd 2,025Hevi-Lift Limited 1,975

Busiest routes, all ten

GKAPort Moresby 937Mount Hagen 209
WWKPort Moresby 936Vanimo 354
HKNPort Moresby 1,039Lae 469
MAGPort Moresby 815Wewak 264
KVGPort Moresby 473Rabaul 296
GURPort Moresby 627Misima Island 156
VAIPort Moresby 425Wewak 377
MASPort Moresby 164Kavieng 116
BUAPort Moresby 365Rabaul 205
UNGPort Moresby 493Daru 104

Port Moresby is the busiest route at every one of the ten. These are spokes, not a network.

04 · The day

Flights bunch into the morning

Recorded movements by hour of day. Nothing moves at night at any of the ten — which is why the peak-hour factor, not the annual total, drives every facility figure.

GKA3:00 – 18:00
WWK5:00 – 18:00
HKN5:00 – 18:00
MAG4:00 – 18:00
KVG3:00 – 19:00
GUR4:00 – 18:00
VAI4:00 – 18:00
MAS6:00 – 18:00
BUA5:00 – 18:00
UNG5:00 – 18:00
05 · Demand

Where the ten go by 2045

Adopted forecast (S2). Together the ten carry 794,832 passengers in 2026 and 1,452,616 in 2045. Left of the dashed line is the record; right of it is forecast. Each airport keeps its colour throughout this page.

069k139k208k278k20112020202620352045forecast →GKAWWKHKNMAGKVGGURVAIMASBUAUNG
06 · Growth

Growth is not uniform

Kavieng Airport more than doubles (×2.14) while Alotau Gurney Airport grows ×1.63. Two airports the same size today need different buildings in twenty years.

KVG
×2.14
4.1%/yr
HKN
×1.96
3.6%/yr
GKA
×1.87
3.3%/yr
UNG
×1.86
3.3%/yr
VAI
×1.78
3.1%/yr
MAG
×1.77
3.1%/yr
MAS
×1.77
3.1%/yr
BUA
×1.73
2.9%/yr
WWK
×1.71
2.8%/yr
GUR
×1.63
2.6%/yr
07 · Requirement

What has to be built

Across the ten: 4,587 m² of additional terminal floor and 6 more aircraft stands by 2045. The table below steps through the check years the report uses.

Airport20262030203520402045
Terminal m²StandsTerminal m²StandsTerminal m²StandsTerminal m²StandsTerminal m²Stands
GKA Goroka98031,09131,27741,53141,8085
WWK Wewak Boram1,02531,02931,18931,41231,7074
HKN Kimbe Hoskins757388531,03231,18931,4653
MAG Madang6682694282331,01031,2113
KVG Kavieng53526942823396031,1583
GUR Alotau Gurney44624222532260427292
VAI Vanimo36423822443250926242
MAS Manus Momote32423402406247726032
BUA Buka29223052363242424902
UNG Kiunga21922292282333934013
08 · Cost

What it costs, element by element

Direct works split into seven elements, then utilities, design and contingency on top. Total for the ten is $129.6m in 2026 prices.

GKA
$16.54m
$11.89m direct
WWK
$15.17m
$10.90m direct
KVG
$14.20m
$10.21m direct
MAG
$14.04m
$10.09m direct
UNG
$13.74m
$9.88m direct
HKN
$13.22m
$9.51m direct
GUR
$10.92m
$7.85m direct
MAS
$10.73m
$7.71m direct
VAI
$10.70m
$7.69m direct
BUA
$10.33m
$7.43m direct
Terminal — newTerminal — refurbishmentApron pavementTaxiwayLandsideLighting and navaidsAirside ancillaryUtilities, design, contingency
09 · The finding

Cost does not follow demand

Kiunga Airport carries the smallest forecast of the ten — 57,736 passengers in 2045 — yet ranks 5th of ten on capital cost at $13.74m. Lighting, fire cover, fencing and service roads are largely fixed: a small airport still needs them.

070k140k210k281k$9m$14m$19mGKAWWKHKNMAGKVGGURVAIMASBUAUNGPassengers in 2045
10 · Timing

When the money is spent

Three phases. Real is 2026 prices; as spent adds escalation to the midpoint of each phase. The gap across the ten is $40.0m — that is escalation, not extra work.

Short term2026–2030
$78.0mreal
$85.5mas spent
Medium term2031–2037
$36.7mreal
$53.0mas spent
Long term2038–2045
$14.9mreal
$31.1mas spent
11 · Recovery

What each passenger would have to carry

Capital charge over 30 years at 6%, plus 3% a year for operating and maintenance, divided by 2045 traffic. Kiunga Airport needs $24.43 a passenger; Wewak Boram Airport needs $6.37.

UNG
$24.43
57,736 pax
BUA
$14.51
73,091 pax
MAS
$12.99
84,762 pax
VAI
$12.42
88,447 pax
GUR
$10.86
103,188 pax
KVG
$8.86
164,609 pax
MAG
$8.50
169,523 pax
HKN
$6.56
206,990 pax
GKA
$6.54
259,813 pax
WWK
$6.37
244,457 pax
12 · Basis

What these numbers rest on

Shared by all ten airports

Load factor 0.45 · peak-hour factor 0.142 · directional split 0.55 · 18 m² per peak passenger. These are programme parameters, not findings about any one airport.

PNG AMPC peak-hour method — programme parameters carried in the project extract. Seats per movement is cross-checked against the OAG 2025 observed schedule

Specific to each airport

Seats per movement, the demand forecast, the observed fleet mix and the committed works. Everything else follows from these.

Adopted planning value, cross-checked against the OAG 2025 observed seats per departure at this aerodrome

Planning allowance. Consistent with the ADRM 12th Edition Exhibit 3.3.4.7 optimum space guidelines for the facilities a domestic passenger uses, with circulation, concession and back-of-house added

Where a survey would change the answer

Planning allowance for a single-apron provincial aerodrome, to be replaced by measured quantities at layout design

Median of the three PNG AMPC regional hub workbooks (Mount Hagen, Nadzab, Rabaul Tokua)

The movement record covers part of the year only — August and September are absent for all ten airports. Hour-of-day shape is usable; month-to-month totals from this record are not, and no seasonality is claimed here.